New Aldi Store Flitwick
Client: JME Construction Location: Flitwick, United Kingdom
Overview: DD Lining Services was contracted by JME Construction to supply and install three stormwater attenuation tanks for the construction of a new Aldi store in Flitwick. The project aimed to effectively manage stormwater runoff on-site, prevent flooding, and ensure compliance with local environmental regulations.


Project Details:
- Client: JME Construction
- End Client: Aldi Stores Limited
- Location: Flitwick, Bedfordshire
- Number of Tanks: 3
- Tank Capacities: Tank 1 – 80,000 liters, Tank 2 – 100,000 liters, Tank 3 – 120,000 liters
- Material: High-density polyethylene (HDPE) tanks chosen for their durability and resistance to corrosion and leakage.
Challenges:
- Stormwater Management Compliance: The project needed to meet local stormwater management regulations, ensuring the proper handling of excess rainfall to prevent flooding and minimize environmental impact.
- Space Constraints: The site had limited available space for stormwater attenuation infrastructure, requiring a thoughtful design to optimize the use of the allocated area.
- Construction Schedule: The project had a strict timeline, requiring efficient planning and execution to meet the construction milestones and handover deadlines.
DD Lining Services’ Approach:
- Detailed Site Assessment: DD Lining Services conducted a comprehensive site assessment to evaluate the site’s topography, soil conditions, and drainage patterns. This assessment allowed them to design an effective stormwater attenuation system tailored to the specific needs of the site.
- Customized Design: Based on the site assessment, DD Lining Services designed a system comprising three interconnected HDPE attenuation tanks with varying capacities to manage stormwater runoff efficiently. The tanks were strategically positioned beneath the parking lot, optimizing space utilization and minimizing disruption to the site layout.
- Professional Installation: DD Lining Services deployed a skilled team of technicians to install the stormwater attenuation tanks, ensuring precise excavation, seamless tank placement, and secure connections to the existing drainage system. The installation was carried out with strict adherence to industry standards and best practices.
Results and Benefits:
- Effective Stormwater Management: The installation of the stormwater attenuation tanks provided a reliable system for managing stormwater runoff, reducing the risk of flooding on-site, and protecting the surrounding area from excess water.
- Compliance with Regulations: The stormwater management system complied with local regulations, demonstrating the commitment of JME Construction and Aldi Stores Limited to environmental responsibility.
- Optimal Space Utilization: DD Lining Services’ expertise enabled the design and installation of the attenuation tanks in a manner that maximized the use of the limited available space, allowing for seamless integration with the overall site layout.
- Timely Project Completion: DD Lining Services completed the installation within the stipulated timeline, enabling JME Construction to adhere to the project schedule and meet the handover deadlines for the new Aldi store.
Conclusion: DD Lining Services successfully supplied and installed three stormwater attenuation tanks for the New Aldi Store project in Flitwick, in collaboration with JME Construction. By designing and installing an efficient stormwater management system, DD Lining Services contributed to preventing flooding, ensuring compliance with regulations, and optimizing the use of space. Their professional approach, adherence to industry standards, and timely completion of the project showcased their commitment to delivering high-quality stormwater attenuation solutions.
